THE UMM QASR POWER PLANT

Branding

Employer

Prime Metro Power Holding (PMPH)

Role of BUTEC

Main contractor

Commencement Date

February 2019

Completion Date

February 2020

 

The Umm Qasr Power Plant (“UQPP”) project consists of the design, construction of a 29.34MW (Phase 1) gas fired captive power plant located at Umm Qasr Port, Basra Governorate, Republic of Iraq.  BUTEC delivered phase one in less than a year, a record time for the design and construction of this 29.34MW plant.

The power plant is financed and operated by Menatech Energy Ltd, an entirely owned subsidiary of Prime Metro Power Holding. BUTEC scope of work covered overall turnkey design, procurement, construction, and commissioning of Umm Qasr Power Plant 29.3 MW based on reciprocating gas engines (3 x 20V34SG) in accordance with WARTSILA(FI)’s specifications and Employer’s requirements including the Power house, Electrical Building including LV, MV switchgears, Control Room, Electro-Mechanical process and balance of plant services, comprising tanks, steel structures and concrete structures, administrative building, guard house, warehouse and workshop facilities, connection to the 40 bars Natural Gas pipeline through Gas Pressure Reducing Station and finally the Step-up transformer (60MVA – 11/33KV) and transmission lines connecting the plant to the existing General Company for Ports of Iraq (GCPI) substation.

The power plant started its commercial operation and is designed to deliver base load of 24/7 power to the Umm Qasr Ports Authority Zone.

 

  • Date

    September 14, 2017
  • Client

    Apple Inc
  • Categories

    Construction
  • Share

    Facebook, Twitter, Google
Launch Project
Prev
Next

Contact Us

3601 Marina Plaza
Dubai Marina
Dubai, UAE

tel: +971 4 429 0599
fax: +971 4 429 0216

© 2021 - All rights reserved by ALEC Butec
Back to Top